From: route@monster.com
Sent: Friday, April 29, 2016 3:28 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
SAMUEL M. ESTABILLO 607 West
Broadway, Apt 200 Anaheim,
CA., USA, 92805 Mobile
Phone: (714) 833-3626 Secondary
Phone: E-mail:
smestabillo@yahoo.com
Linked
In: ph.linkedin.com/pub/samuel-estabillo/54/627/495/ OSP Regional Project Manager – Optical Fiber Deployment &
Implementation I
have 29 years of combine working experience with expertise in
Telecommunication Industry Knowledge from Project Planning, Design &
Implementation. This includes FTTH Optical Distribution Network (ODN) to
Operation & Maintenance of OSP Fiber Optic Cable. A successful,
self-motivated Subject Matter Expert for OSP and Fiber Optic network
implementation, possessing extensive knowledge and global experience in the
telecoms industry, Project Management, Construction and Technical Support.
Brainbench Certified in Telecom Industry Knowledge. CORE COMPETENCIES ·
End to End Project Management and Control
(Contracts Implementation) ·
Leadership, Motivation & Mentoring
(Managing of Sub-contractors and Direct Labor Groups) ·
Ability to manage multi-cultural group of
people. ·
MS Office proficient (MS Excel, Word,
PowerPoint, Outlook) ·
Process improvement and Quality Assurance ·
Risk Assessment and Crisis Management ·
Budget Monitoring & Control ·
Data analysis and resolution to improve
efficiency and cost control ·
Troubleshooting & rapid
restoration ·
Ability to Interpret Technical Manuals &
Drawings ·
Ability to generate and present reports or
presentations to upper management and other stakeholders PROFESSIONAL EXPERIENCE OSP Regional Project Manager – FOC
Deployment & Implementation (Globe Nemesis Project) December
2012 – February 28, 2015 Huawei
Technologies, Philippines Huawei Technologies is
a Chinese multinational networking and telecommunications equipment and services company headquartered
in Shenzhen, Guangdong. It is the largest telecommunications
equipment maker in the world (Wikipedia 2012). Operating
revenue: US$ 46.5 Billion (2014) No. of Employees:
150,000 (2013) SIGNIFICANT ACHIEVEMENTS: ·
Successfully delivered the substantial
completion of the OSP Full Turn Key project for the deployment of 2,300 Kms
of Fiber Optic Cable Network for 9 major rings connecting 25 Aggregator (AG)
Nodes, 103 loops for Access Nodes (AN) with 707 AN segments / 589 AN sites in
North Luzon GLOBE Nemesis Modernization project. This is one of Huawei's
biggest project in the world. ·
Revised the Engineering Design by fiber
re-utilization that resulted to reduction of 165 Kms Fiber Optic deployments
from the original fundamental design without affecting the site fiber
connectivity. ·
Introduced & implemented the use of
Fiber buffer slitter during fiber insertion to avoid alarms & unnecessary
cutting of fibers that are not included for insertion activity for Globe
Nemesis Project. ·
Lead the North Luzon OSP team to achieved
no. 1 in horse race for all regions for 1st Quarter
2015 in terms of Site connectivity, Acceptance & Billing milestone. DUTIES & RESPONSIBILITIES: 1.
Lead cross functional teams of 2 Project Managers, 7 telecom Engineers, 2 ROW
supervisors & 5 major sub-contractors to deliver OSP Full Turn Key
project for the deployment of 2,300 Kms of Fiber Optic Cable connecting 9
major rings with 25 Aggregator (AGG) Nodes, 103 loops for Access Nodes (AN) with 707 AN segments / 589 AN sites in North Luzon
GLOBE Nemesis Modernization project. This is one of Huawei's biggest &
most complex project in the world. 2.
Creates and delivers presentations to client, senior management & other
stakeholders on project milestone goals and plans, including progress
reports. 3.
Develops and revises complex project plans and budgets, works with various
domain stakeholders to understand complex problems and focuses on bringing
issues to resolution, escalating as necessary to meet timelines. 4.
Evaluate Optical Test & Quality checklist reports to ensure excellent
workmanship before endorsing for Provisional Acceptance Test to client
Quality Assurance Team. 5.
Project Control Monitor by documenting daily project progress against the
baseline, constantly updating OSP build plan Tracker, Material requirements,
Work Completion Accomplishment Report, Issue registry and preparation of
Daily Target Progress report to be submitted to National team & other
stakeholders. 6.
Identify and evaluate the potential problems for the whole project lifecycle
and works to mitigate risks to ensure project deliverables and targets are
achieved without or minimal project risk exposure. 7.
Implement Change Management by recommending to client the required
Engineering Design changes according to on-site conditions. Submit Request
for Facility Allocation, MOP for FOC insertion, Work Change Request &
justification for client approval before implementation. 8.
Check & ensure the accuracy of Work Completion Accomplishment Report
submitted by the subcontractors before approving their billing invoices in
every milestone. 9.
Ensure completion of all Technical documents from PAT to Final Acceptance
Test report, Bills of Materials and As Built Red line drawing plans for
billing and handover purposes to client. 10.
Deliver end-to-end project management, with ownership of the entire process
from beginning to end. Also, attend and conduct Weekly Project Status meeting
with various sub-contractors & client. Project Manager – FTTH
Design and Implementation (PLDT Full Turnkey Project) July
2012 – December 2012 Fiberhome
International Technologies - Philippines Fiberhome
International is a major networking and telecommunication equipment provider in the People's Republic of China. Founded in 1999, Fiberhome Networks was one
of the 8 affiliated companies and highly specializing on IPnetworks under the management of Fiberhome
Company. No. of employees: 512 (2009) SIGNIFICANT ACHIEVEMENTS: ·
Successfully completed the FTTH project for
12 sites in Metro Manila South with installation of 91 LCP, 728 NAP, 88 Kms
FOC which covers 5,824 subscribers capacity within 5 months. ·
Secured the hard to get Right Of Way for all
the FTTH sites before implementation. DUTIES & RESPONSIBILITIES: Managed 2 Design Engineers & 2 major sub-contractors
for the deployment of FTTH Full turn Key project within Metro Manila south.
This is an end to end project from Engineering Survey & design, Acquisition
of Right of Way (ROW) for Construction Permit, Project implementation &
documentation until Final Acceptance sign off from the client. 1.
Develop the project design and construction plan for the timely completion of
the project within budgeted costs and to meet committed user requirements. 2.
Meet with concern persons & Local Government officials for the Site
Acquisition, Engineering Site Survey & Right of Way (ROW) permit before the
project implementation. 3.
Supervise the sub-contractor teams to ensure that sub-contracted work is
delivered according to project specifications & standards. 4.
Track and ensure that assigned projects are managed and executed according to
Project Implementation Plan, Cost budgets, Delivery targets and Quality
standards. 5.
Attend weekly coordination meeting with the client (PLDT) &
sub-contractors in order to update the milestone of project status and
accomplishments. 6.
Recommend to client the required design changes according to on-site
conditions and dynamically revised designs without compromising the quality
standards to meet project specifications and obtain client approvals before
the implementation. 7.
Document and record all Project approvals, Engineering design, processes,
permit and ensure they are kept updated for current and future references. 8.
Generate Technical documents like Pre-testing report, Final Acceptance Test
report, Bills of Materials and As Built drawing plans for billing and
handover purposes. 9.
Ensure workmanship Quality by conducting pre-PAT and PAT before endorsing to
client representative for Final Acceptance. 10.
Identify and assess the potential problems for the whole project lifecycle
and works to mitigate risks to ensure that corporate exposure to risk is
avoided or minimized. Regional Project Manager OSP Field O & M for
Mobily Eastern & Northern Region, K.S.A. November
2010 – July 2012 Mastoura
Trading & Contracting – K.S.A. Telecommunications
Services Dept. Total Project Cost: USD 2.4 million Mastoura
Trading & Contracting Co. is one
of the biggest contractors of Telecom Networks, Electrical Transmission, Pipe
laying, Civil works in Eastern Region, Saudi Arabia. No. of
Employees: 3,500 (2012) SIGNIFICANT ACHIEVEMENTS: ·
Successfully managed the Operation &
Maintenance of Mobily OSP facilities according to SLA KPI of 99.99%
network availability 24x7. This includes 2500 Km of Fiber Optic Cable link
for Alcatel, Huawei & Ciena DWDM, IP/MPLS, HSDPA, GSM, WiMAX, GPON FTTB
and FTTH Network in Eastern & Northern Region, K.S.A. ·
Contributed 80% in the preparation of Mobily
FTTH O & M manual created by special committee that prepared guidelines
for Access Network Development (AND) project for the whole Kingdom of Saudi
Arabia. ·
Prepared winning bid proposal for Mobily
Fiber Infrastructure Network (GSM) project & Access Network Development
(FTTH/FTTB) project. ·
Conceptualized & proposed the Load
Sharing System configuration for DC Rectifier to charge backup batteries of
Telecom equipment in Mobily. Previous configuration is stand alone system. ·
Conceptualized & propose the utilization
of Remote Fiber Test System (RFTS) in order to identify the immediate
location of fiber break to improve Mean Time To Restore (MTTR). DUTIES & RESPONSIBILITIES: 1.
Managed 44 multi-cultural people composed of telecom Engineers, Fiber Optic
Technicians and Inspectors
in Mobily OSP FOC Operation & Maintenance Team for the whole Eastern
& Northern Region
with 8 Remote Management Centers (RMC).
7.
Generate and submit monthly invoicing on time
for the efficient collection project receivables and billings.
10. Lead
the Crisis Management team 24x7 during emergency restoration of link failure
due to Fiber Optic Cable (FOC) cut or other root causes affecting the
network. Also prepare Incident Report & Root Cause Analysis Report. 11.
Coordinate with equipment vendors like Alcatel, Huawei & Ciena NOC to
resolve outstanding issues concerning O & M of Fiber Optic Infrastructure
and Access Network to ensure tracking & closing of all trouble tickets. 12.
Recommend OSP FOC relocation & Implementation plan according to request
from different stakeholders like Municipality, MOT, MOW & MOA due to
bridge construction or any other improvement projects that affects Mobily FOC
route. Telecom Project Engineer/Supervisor – Saudi
Telephone Co. (STC) project March
2010 - October 2010 Mastoura
Trading & Contracting - KSA Telecommunications
Services SIGNIFICANT ACHIEVEMENTS: ·
Successfully completed the deployment of
FTTH 29 FDT outdoor & 4 indoor cabinets STC project with 19,008
subscriber capacity in Dammam, KSA. ·
Successfully implemented the Network
Modernization Project (NEMO) of Ministry of Interior that includes laying,
commissioning & testing of 400Kms Fiber Optic Cable interconnecting MOI
offices. DUTIES & RESPONSIBILITIES: 1.
Supervised 6 teams for the implementation & successful completion of
various Saudi Tel Co (STC) expansion projects such MOI Network Modernization
Project (NeMo). Project Manager - Tarlac Water District Expansion &
Maintenance Project May 2008
- March 2010 Blue
Eagle Enterprises – Philippines Engineering
Services Managed
5 teams for the implementation of various expansion project of Local Water
Authority. 1.
Supervised the implementation of Local Water Authority (LWA) expansion
project that includes excavation of trench, PVC pipe laying, and installation
of fittings, gate valves, interconnecting and hydro-testing.
3. Act
as Project Engineer and Field Supervisor during Project Implementation.
6.
Ensure the Productivity & Safety of the personnel during project
implementation.
Sales & Marketing Manager February
2002 - May 2008 Princess
Kim Enterprises - Philippines Retail
and Marketing Services Managed
4 sales team in the marketing & distribution of food products in 4
provinces. 1.
Supervised product inventory, auditing and distribution to ensure efficient
delivery.
Senior Radio /Telecom Technician – PLDT
Network Operation Center (NOC) August
1989 - July 2001 Philippine
Long Distance Telephone Company (PLDT) Philippine
Long Distance Telephone Company (PLDT) - is the largest telecommunications company
in the Philippines. Service revenue: PHP 121.6 billion (September
2013) No. of employees: 36,740 (2013) SIGNIFICANT ACHIEVEMENTS: ·
Solve the overheating problem for Siemens
OLTE card in PLDT by designing and installing additional cooling system that
resulted to 60% reduction of card failures. ·
Served as Guest Resource Speaker in PLDT
Technical Training program for various subjects in Digital Transmission
System from 1994 to 1999. ·
Served as Assistant Team Leader in
Evaluating Digital Radio System life expectancy in PLDT for future Network
planning & deployment of additional Transmission System. ·
Conceptualized & Installed additional
Auto-regulator rectifier to charge the maintenance free batteries of
IRT-Multi-Access radio in PLDT that resulted to improved circuit
availability. ·
Conceptualized the use and Installation of
Tadimux from EWSD switching room to TMC for lease lines, IPL & NPL
circuits in PLDT. DUTIES & RESPONSIBILITIES: 1.
Operate & maintain the Wireline & Wireless Telecom Core Network
Transmission System that includes Digital Microwave Radio System, Fiber Optic
Cable Transmission System, PDH/SDH Terminal Equipments, ONU, ATM Frame Relay,
Point to Point & Point to Multipoint Radio System, Circuit Provisioning
of Voice & Data Transmission, Telephone System, Data Modem &
Interfaces. 2.
Participate in Project Implementation, Installation, PAT and Commissioning of
various Telecom Equipments.
9.
Conduct preventive and corrective maintenance to all on-site and off-site
telecom equipments.
13.
Generate Daily Status Report (DSR), Preventive Maintenance Routine (PMR)
& Corrective Maintenance Report.
Broadcast Maintenance Technician May 1985
- August 1989 Eagle
Broadcasting Corporation Broadcasting,
Music, and Film 1.
Operate and maintained 3 broadcast transmitters and its ancillary equipments
such as STL, Turntables, Audio Console, and Emergency Power Generator.
5.
Support the Field reporter during Remote Broadcast coverage.
EDUCATION Associate
Degree, Diploma in Computer Engineering Graduated
International
Correspondence School, Philippines Philippines Associate
Degree, Diploma in Communication Technician Graduated
(Class Valedictorian) National
Radio School & Institute of Technology Philippines Certificate
in Electrical Engineering Completed
Div. 1 International
Correspondence School, Philippines Philippines CERTIFICATIONS:
·
Holder of 33 various Training
Certificates in Telecommunications (* Please see
below details) SKILLS:
LANGUAGES
:
HONORS
& AWARDS: ·
International & Luzon Core Network Model
Employee ·
Consistent North Luzon Core Network Achiever
Awardee ·
Plaque of Appreciation as Guest Resource
Person for Training in Digital Transmission System ·
Various Commendation Letters from PLDT
Executives for exemplary work performances.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
Aboriginal Dialects |
Fluent |
|
|
English |
Fluent |
|
|
Tagalog |
Fluent |
|
|
|